Shed floor framing and skids 10-31

This week we framed up a 12'x24' floor. Used pressure treated lumber and 16penny galvanized nails to attach them with. The ends we're screwed and predrilled to prevent splitting


This is with the two end sections allMost all sheathed with advantech. We used 2x8 pieces to keep the frames square to prevent it from racking as the plywood was put on. Liquid nail was applied to prevent squeeking. 



The 4x4 skids were attached so they could be moved around without breaking. We used 6 and 5" riser screws to attach them to the blocking 