Friday, October 24, 2014

Concrete pour

This week we got the final touches done on the slab. The foam, Vapor barrier and screen got finished up. This is before the pour.


In this photo they are screding the concrete to get the final grade. There are pieces of rebar placed at the finish grade hight. After making your grade height you go back to front with finish grade.


After the slab is set up and has started to harden, you use a trowel to smooth off the top. There are a fine mud like mixture on the top of the slab. This is worked around to make a smooth surface.

There was extra concrete left over so we poured a small slab to place the stairs on.