The Inside and outside of the foundation needed to be compacted so there wouldn't be any settling after the slab was poured. It's critical to have a good slope for water to shed off after it's complete
Today we finished the mud sills. And started to prepare for the girder to be set. We ran the string line for the top of our plate to make the temporary posts. 


Also we constructed batter boards to practice concrete form framing. It was very tedious and a lot of pre-planning / thinking what the next move would be. 