Thursday, April 30, 2015

Week 27



Short ledges were used on each side of the window, and measurements from the top of the window was taken to make sure they didn't sag. Staple gun was used for the shingles.
Taking sheathing off the flooring system. Then the joists and girder was taken down.

All the clap boards were nailed up, the top ones needed to be ripped due to being on the furring strips. The bottom clap boards had to be notched around the windows.

Vary close to the having to cut all the shingles from this point on. The ledger will be cut each time to fit good.
We used wide shingles for the ones that went with the rake. Take a large shingle about 8" wide and go from a point back using 22.5 degrees due to the 5/12 roof. These needed to be pre-drilled and then nailed up with 6 penny ring shank nails