Monday, April 13, 2015

Week 24



Roofing is all finished. Used a coil roofer with 1.25" nails. Just fallowed the tabs on the shingles for exposure.

Ridge vent was installed with 2" roofing nails. This allows the shed to breath. Then caps are put on top of the vent.

Shingling is all done, the bottoms were let down 1/4" for water. The gap in the top is for the ridge vent to allow air out.

No comments:

Post a Comment