Monday, April 13, 2015

Week 23



Drip edge has been applied and shingling has been finished. The ridge vent has been applied too. The cap shingles are nailed on with 2" roofers.

Drip edge for the gable has just one lip. The soffit has two lips so the water falls off without going down the fascia. The line is for starter strips for shingles.

The starter strips have been applied and held to the line. Nailed off with 4 nails, Hurricane nailing uses 6 nails.

No comments:

Post a Comment