Wednesday, February 25, 2015

Week 18






The corner had to be shimmed out due to the fact that we are creating a air space for water to evacuate. In this case we used 1/2" plywood
The blocks on the roof are for the fascia to land on. This makes it easier to get the fascia to a point. we cut the angles on the top first then let them run wild.

The fascia was kreg jigged on the back to hold it together good. The seam was wood glued as well. This is for added strength.

This is the first part of a three piece soffit assembly. The 1x6 pine was ripped down the middle and the edge was set flush to the rafter tails.

Another shot of the soffit tacked up to the rafter tails.

No comments:

Post a Comment