Monday, December 8, 2014

12-5-14 posts

Floor is assembly all together. Plywood is placed to allow the frame to be walked on and the posts can be put in. Had to square and squeeze it together

This is one of the many Mortis joints we need to make. All 4 posts need these done to them.
John is cutting the pieces out of the square beam. It take a lot of time to cut these out and have them come out right 

No comments:

Post a Comment