Thursday, December 18, 2014

12-12-14

After a ton of work cutting the Mortis' into the posts, the tennons and costom fitting them to each corner it was a good feeling to get them all in. After messing a post up and having to start all over it took a while to get here.
Cutting knee braces took a while to figure out. After we got it down they went really fast. The depth wAs set on the chop saw and they were all cut to the same depth. 
This is the moris that we had to cut out of all the posts. The sides of the flat were drilled out and then drilled again with the right angle drill. Then chiseled out to a 45


No comments:

Post a Comment